Injection Mould Production

Rapid Tooling

Our rapid tooling chain gives you immediate access to a small series of good material plastic components, within a timeframe of 3 to 4 weeks maximum. The technical choices and mechanical “tricks” (demoulding with handheld blocks…) held by us ensure you receive the best value for money, based on quality, cost and lead time.

Series Moulds

Thanks to an integrated BE, a production workshop equipped with new machining technologies and a network of local and national partners, Frilame knows how to meet the demands of series moulds with a maximum size of 800x500, respecting the three-probed quality/cost/lead time factor.